Electronics is one of the fastest-growing nearshoring sectors in Mexico. But an electronics plant needs a controlled environment where the building is part of the process.
Why electronics is coming to Mexico
The electronics and contract-manufacturing (EMS) supply chain is concentrating in Mexico thanks to US proximity and USMCA. Suppliers like Luxshare and Leoni already produce here.
ESD control and environment
Electrostatic discharge (ESD) control, temperature and humidity are critical. Flooring, grounding and HVAC must be designed for the process from the start.
Cleanrooms where required
Semiconductors, optics and precision components require ISO 14644 cleanrooms, integrated with HVAC and MEP.
MEP and utilities
Stable power, process gases, compressed air and quality water are part of the MEP scope, coordinated in BIM.
Phased delivery
Electronics has fast product cycles; an EPC / design-build team delivers in phases to start on time.
CTECP
CTECP builds electronics and precision facilities in Mexico for sector clients, with 250+ projects and 580,000+ m² built.
