The energy transition and the demand from new industrial plants are driving solar and renewable projects in Mexico. Building them well takes engineering and interconnection management.
Why renewables are growing in Mexico
High solar resource, pressure for clean energy and the demand from nearshoring plants make renewables an expanding sector.
Project types
- Utility-scale PV parks
- Distributed rooftop generation on industrial buildings
- Plants for component manufacturing (modules, inverters)
CFE interconnection
The CFE grid interconnection and energy permits are usually the critical path; managing them early is key.
Civil works and installation
Foundations, support structures, module installation and electrical works, with quality control and safety.
Environmental permits
SEMARNAT and local codes are integrated from design.
CTECP
As an EPC / design-build contractor, CTECP delivers industrial and energy projects in Mexico under one team, with 250+ projects and 580,000+ m² built.