CTECP 中科工程← All projects
Industrial

Large Industrial Base — San Luis Potosí

Client
Confidential
Sector
Industrial Manufacturing
Size
51,000 m²
Delivery
Design-Build
Location
San Luis Potosí, Mexico

A 51,000 m² industrial base — integrated structure, finishes and utilities.

Overview

A 51,000 m² industrial manufacturing base delivered by CTECP in San Luis Potosí, with structure, finishes and plant utilities integrated under one design-build scope. Projects like this are where CTECP's 580,000+ m² of built area and single-team model show their value.

Our scope

Why it matters

One team, one contract, one responsibility — from the first column to commissioning.

Planning a similar project? Let's build it.

Get a Quote →
More projects
← View all projects