Your equipment clears customs. Then it can't be energised.

A CE mark, a CCC mark or a supplier's own certificate is not a US listing. Equipment that is not listed by an NRTL usually needs a field evaluation performed after it is installed — which lands between mechanical completion and start-up, where your schedule has no float left. Find out now, not then.

Written review within 3 business days · English · Español · 中文 · US +1 904 788 3028

We have watched this happen on both sides of the border: the building is finished, the line is bolted down, and the project stops for weeks because an inspector will not sign off on a panel built overseas.

The timing is what makes it expensive.

A field evaluation is site-specific and one-time. It labels that machine, in that location, which means it cannot be cleared at the factory before shipping. It has to happen after installation.

So the discovery always arrives at the worst possible moment — after the money is spent, after the building is done, and with a production date already promised to someone.

Equipment approval pre-check

Answer four questions about one item. Runs entirely in your browser — nothing is sent anywhere, nothing is stored.

This is a planning aid, not a code ruling. Acceptance always rests with the Authority Having Jurisdiction for your site. Based on NEC 110.3(B) and 110.3(C), and field evaluation practice under NFPA 790 / NFPA 791.

What the full review gives you

Send us the equipment list and we come back in writing, item by item:

1 · Approval path per item

Listed and fine, needs a field evaluation, or needs a conversation with the AHJ before it ships. No blanket answers.

2 · What to demand from the vendor

The documents that make a field evaluation fast instead of slow — schematics, component listings, bills of material — and which are cheap to get now and impossible to get later.

3 · 50 Hz exposure

Which machines genuinely need re-specifying for 60 Hz, which can be driven, and which will quietly run 20% fast and damage your process.

4 · Where it hits the schedule

The items that will sit between mechanical completion and start-up, so you can start them during fabrication instead of discovering them at commissioning.

The best time to run this is before the purchase order. The second best is before the container sails. After the equipment lands, your options narrow to whatever the AHJ will accept.

What it is not

We are a contractor, not a certification body. To be precise about what you are getting:

Why we do it for free. Because the projects that go badly are the ones where nobody asked this question early, and we would rather meet you at the purchase order than at the commissioning crisis. If you then want someone to build the plant, you will know what we are like to work with.

Who it is for

Who does it

CTECP is a design-build / EPC general contractor founded in Mexico in 2016, working in the United States through CTECP INC — Houston and Dallas, Texas, and Greenville, South Carolina.

250+projects delivered
580,000+ m²built
9countries
USD 20M+bonding capacity

What we are built for is the crossing itself — taking an engineering package and an equipment list produced in China or Europe and getting them through US code acceptance, with licensed US subcontractors, in English · Español · 中文.

Send us the equipment list

A line list is enough to start — description, origin, voltage and frequency, and whether anything holds pressure. We will tell you what is in your way.

Written review within 3 business days · we do not share your equipment list with anyone

© 2016–2026 CTECP · CTECP INC — Houston · Dallas · Greenville, SC · www.ctecp.com · Read the full guide →