In an industrial plant, power is not a detail — it is often the critical path that decides when production starts. The substation and electrical infrastructure deserve attention from day one.
Why power is the critical path
The CFE interconnection, load studies and energization usually have the longest lead time in the project. Not managing it early delays the whole launch.
The substation
Capacity, medium voltage, transformers and protection are sized to the plant's load and future growth.
Distribution and electrical MEP
Switchgear, raceways, grounding and internal distribution are designed and installed coordinated with the rest of MEP and the structure (BIM).
Backup and reliability
Generators, UPS and redundancy per process criticality (data centers, pharma, electronics demand more).
Compliance
Electrical NOM and CFE requirements are integrated from design.
CTECP
CTECP integrates electrical infrastructure and the substation within its design-build scope, managing interconnection as a priority. 250+ projects, 580,000+ m².