CTECP
Project team · salaried

Project Engineer — Bilingual English / Mandarin

Full-timeUnited States · office + project sitesStart: Rolling — interviewing now

About the role

Be the technical link between a Mandarin-speaking ownership and design team and the English-speaking field: drawings, submittals, RFIs, quantities and schedule.

What you'll do

  • Manage submittals, RFIs and drawing revisions; check owner-furnished material lists against the drawings (metric-to-imperial).
  • Perform quantity take-offs; support monthly pay applications and change-order pricing.
  • Maintain the schedule, procurement log and document control; prepare weekly reports in English and Chinese.
  • Support the superintendent with layout checks, inspection requests and as-built records.

What you bring

  • Bachelor's degree in civil, structural or construction engineering; 2+ years on US construction projects (strong internships considered for a junior level).
  • Professional fluency in English and Mandarin, including reading Chinese drawings and specifications; Spanish a plus.
  • AutoCAD, Bluebeam, Excel; MS Project or P6 a plus.
  • Authorized to work in the US without sponsorship.

Nice to have

  • EIT.
  • Steel fabricator shop-drawing experience.
  • Revit / Navisworks.
Pay: competitive, based on experience. Hourly roles: overtime per FLSA; PPE provided.
Openings are tied to project schedules and may be contingent on contract award; we are interviewing now.

CTECP INC is an equal opportunity employer. All qualified applicants receive consideration without regard to race, color, religion, sex, sexual orientation, gender identity, national origin, age, disability or veteran status. Applicants must be authorized to work in the United States; we complete Form I-9 for every hire. Visa sponsorship is not available for these positions. Pre-employment drug screening and background checks may be required by project-site rules.

Project team · salaried