CTECP
Project team · salaried

Site Safety Manager (HSE)

Full-timeUnited States · project siteStart: Rolling — interviewing now

About the role

Own safety on a steel-erection and heavy-concrete site under a zero-tolerance owner: fall protection, crane and rigging, excavation, hot work and confined space.

What you'll do

  • Write and implement the site-specific safety plan, JHAs and permits (hot work, excavation, confined space, critical lifts).
  • Run orientations, toolbox talks and daily inspections for all crews and subcontractors; stop work when needed.
  • Verify every worker's OSHA 10/30, operator and rigging credentials; keep training records audit-ready with the office.
  • Lead incident investigation, reporting and corrective actions; maintain OSHA 300 logs.

What you bring

  • 4+ years construction safety with steel erection and crane operations experience.
  • OSHA 30 (construction); CHST, STS-C or equivalent preferred; First Aid/CPR.
  • Bilingual English/Spanish required for crew communication.
  • Authorized to work in the US.

Nice to have

  • NCCCO signal/rigging credentials.
  • Experience with owner-driven safety audits.
Pay: competitive, based on experience. Hourly roles: overtime per FLSA; PPE provided.
Openings are tied to project schedules and may be contingent on contract award; we are interviewing now.

CTECP INC is an equal opportunity employer. All qualified applicants receive consideration without regard to race, color, religion, sex, sexual orientation, gender identity, national origin, age, disability or veteran status. Applicants must be authorized to work in the United States; we complete Form I-9 for every hire. Visa sponsorship is not available for these positions. Pre-employment drug screening and background checks may be required by project-site rules.

Project team · salaried