CTECP
Licensed subcontractor packages

Industrial Coatings & FRP Lining Subcontractor

Subcontract packageUnited States · project siteStart: Rolling — interviewing now

About the role

Vinyl-ester and epoxy/FRP lining of below-grade basins, trenches and floors in chemical and process-water service.

Scope

  • Surface preparation and vinyl-ester laminate lining (~450 sf) of a concrete basin about 8 ft below floor level.
  • Epoxy fiberglass lining of perimeter trenches (~2,000 sf) and chemical-resistant floor coatings; FRP trench covers.
  • Confined-space entry program, holiday testing and manufacturer-witnessed QC.

Qualifications to bid

  • Documented vinyl-ester / epoxy FRP lining experience in chemical or wastewater service; manufacturer-certified applicators.
  • Insurance in place; NACE/AMPP inspector access a plus.
  • Available on short notice.

CTECP INC is an equal opportunity employer. All qualified applicants receive consideration without regard to race, color, religion, sex, sexual orientation, gender identity, national origin, age, disability or veteran status. Applicants must be authorized to work in the United States; we complete Form I-9 for every hire. Visa sponsorship is not available for these positions. Pre-employment drug screening and background checks may be required by project-site rules.

Licensed subcontractor packages