Strategic Sourcing · Capital Projects

Local or Global Sourcing — Compared on One Delivered-Cost Basis

For packages where dual sourcing is actually viable, we price both routes to the same delivered-cost definition and write down the assumptions behind each line — so your team can compare like with like instead of arguing about what was included.

Reply within 2 business days · English · Español · 中文 · US +1 904 788 3028

Shipping equipment into the US? Run the free equipment approval pre-check →

Most sourcing comparisons fall apart because the two quotes were never on the same basis.

One number includes rigging, the other does not. One assumes DDP, the other EXW. One is valid for 30 days at an FX rate nobody wrote down.

By the time procurement notices, engineering is frozen and the comparison has become a negotiation about scope rather than a decision about value.

Our position is simple: if the basis is not stated, the comparison is not a comparison.

What we compare — and what we do not

We do not offer two full quotes for every line item. Dual sourcing is worth the effort on a specific subset of packages, and we will tell you which of yours qualify before we start.

Typically suited to dual sourcingTypically not
Structural steel and building envelope — high volume, standardisable specificationEquipment where your group has already homologated a manufacturer and it is not open for discussion
Air handling, chillers, precision coolingPackages requiring intensive field service or emergency spares
Cleanroom wall systems, FFUs, filtration, doorsProgrammes too tight to absorb ocean transit
Switchgear, containment, cable managementCases where regional-content requirements outweigh the delta
Non-critical process equipment and utilitiesAnything where a single-source obligation already exists

We say no to packages as a matter of course. A comparison that produces a saving but breaks your programme or complicates a compliance review is not useful to you, and it is not good business for us either.

The delivered-cost basis we quote to

Every line in a dual-source comparison states the following. If an item is excluded, it says so rather than staying silent.

Basis elementWhat is stated
IncotermThe named rule and the named place (e.g. DAP jobsite, or CIF port with onward scope shown separately)
FreightOcean or overland, FCL or LCL, port pair or route
InsuranceWhether marine cargo cover is included, and at what value basis
Duties and taxesThe tariff assumption used and the classification it rests on — stated as an assumption, not as a determination
Customs clearanceWho lodges the entry and whose account the charges sit on
Inland haulage in MexicoPort or border to site, including permits for oversize loads where relevant
Rigging and installationExplicitly included or explicitly excluded — never assumed
FX validityCurrency, reference rate and the date the quote lapses

Import and clearance are part of our normal operation. We move equipment and materials into Mexico by sea for our own construction projects on a regular basis, so customs entry and inland haulage are handled inside the same contract rather than passed to a broker meeting your project for the first time.

Codes and certification — the path, not a promise

We will not tell you that every certification is completed before shipment. Depending on the equipment and the authority involved, some approvals can only be obtained after arrival, after installation, or by a third party on Mexican soil.

What we commit to is that the path is identified and agreed before an order is placed:

Warranty and field support — named party by party

A single blanket statement that "CTECP warrants everything in Mexico" would not survive contact with reality. Responsibility differs by package, and the comparison says which applies:

Who respondsTypical scope
CTECPInstallation workmanship, integration and commissioning of the systems we install, under our construction contract
Authorised service provider in MexicoEquipment where the manufacturer maintains a local service network — response time and spares availability confirmed in the quote
Manufacturer, directProduct warranty on the equipment itself, including cases where support is provided from outside Mexico — with the route and response expectation stated up front

Where local field support does not exist, we say so in the comparison. That is frequently the deciding factor, and it belongs in the decision rather than in a surprise eighteen months later.

Regional content

We provide information only on the regional-content implications of each sourcing route, so your trade compliance and tax advisers can work from a clear picture of origin, tariff classification assumptions and shipment structure.

We do not issue legal, customs, tax or origin-qualification opinions and nothing in a comparison should be read as one. Determinations under USMCA/T-MEC, including regional value content and certification of origin, rest with you and your advisers.

Who we are

Design-build / EPC general contractor, founded in Mexico in 2016, operating in 8 countries. Engineering, permitting, civil and structural works, MEP/HVAC, cleanrooms, commissioning and handover documentation — under one contract.

NOM · CFE · IMSS · STPS · SEMARNAT permitting handled in-house · REPSE registered · trilingual project management English · Español · 中文, so specification questions go straight to the factory without a translation layer in between.

250+projects delivered
580,000+ m²built
70%repeat clients
USD 20M+bonding capacity

Clients include: BMW · Magna · Faurecia · Johnson Controls · CRRC · Whirlpool · Luxshare · LEONI · Nucor-JFE

Request a Dual-Source Comparison

Tell us what you are buying

We will confirm which packages are worth dual sourcing before doing any pricing work. If none of them are, we will tell you that too.

If a manufacturer is already fixed by your group, say so — it usually rules the package out of dual sourcing, and we would rather know now.

Information only — we do not issue origin or tariff determinations.

A datasheet or equipment schedule is enough to start. Please do not upload anything your NDA does not allow.

We treat your information as confidential and do not share it with third parties. No obligation, and not conditional on awarding us work.