About the role
Support concrete, steel and envelope crews: site prep, material handling, housekeeping, flagging and tool support.
What you'll do
- Move and stage materials; assist form setters, rebar workers and finishers; keep the site clean and safe.
- Flag traffic and deliveries; help with layout, barricades and temporary protection.
What you bring
- Able to work outdoors in Texas weather and lift 50 lb; willing to learn a trade.
- OSHA 10 preferred (training can be arranged for strong candidates); authorized to work in the US; reliable transportation.
Nice to have
- Any concrete, steel or paving experience.
Pay: competitive, based on experience. Hourly roles: overtime per FLSA; PPE provided.
Openings are tied to project schedules and may be contingent on contract award; we are interviewing now.
CTECP INC is an equal opportunity employer. All qualified applicants receive consideration without regard to race, color, religion, sex, sexual orientation, gender identity, national origin, age, disability or veteran status. Applicants must be authorized to work in the United States; we complete Form I-9 for every hire. Visa sponsorship is not available for these positions. Pre-employment drug screening and background checks may be required by project-site rules.