About the role
Lead an ironworker crew erecting structural steel frames with mezzanine levels, bracing and purlins — plumb, bolted, welded and inspected.
What you'll do
- Plan daily picks and erection sequence with the superintendent and crane operator; run pre-lift meetings.
- Supervise shake-out, column setting, beam placement, plumbing, bolt-up (snug-tight and pretensioned) and field welding.
- Enforce 100% fall protection and rigging rules; verify crew credentials.
- Track production, bolt counts and materials against the shipping lists.
What you bring
- 8+ years structural ironwork, 3+ years as foreman on multi-level or industrial frames.
- Certified rigger and signal person; AWS welding certification a plus.
- OSHA 30; authorized to work in the US; bilingual English/Spanish preferred.
Nice to have
- Experience with owner-furnished / imported steel packages.
- Metal deck and miscellaneous steel.
Pay: competitive, based on experience. Hourly roles: overtime per FLSA; PPE provided.
Openings are tied to project schedules and may be contingent on contract award; we are interviewing now.
CTECP INC is an equal opportunity employer. All qualified applicants receive consideration without regard to race, color, religion, sex, sexual orientation, gender identity, national origin, age, disability or veteran status. Applicants must be authorized to work in the United States; we complete Form I-9 for every hire. Visa sponsorship is not available for these positions. Pre-employment drug screening and background checks may be required by project-site rules.