CTECP
Field crews · hourly

Metal Wall & Roof Panel Installers

Full-time · hourlyUnited States · project sitemultiple openingsStart: Rolling — interviewing now

About the role

Install insulated and single-skin metal wall panels, roof panels, trim, flashing and accessories on a new industrial building.

What you'll do

  • Lay out, hoist and install wall and roof panels, liner, insulation, trim and gutters per manufacturer details.
  • Operate lifts and telehandlers safely; keep weather-tightness details right the first time.

What you bring

  • 3+ years metal building envelope experience (pre-engineered or architectural panels).
  • OSHA 10; aerial lift training; authorized to work in the US.

Nice to have

  • Standing-seam roofing.
  • Bilingual English/Spanish.
Pay: competitive, based on experience. Hourly roles: overtime per FLSA; PPE provided.
Openings are tied to project schedules and may be contingent on contract award; we are interviewing now.

CTECP INC is an equal opportunity employer. All qualified applicants receive consideration without regard to race, color, religion, sex, sexual orientation, gender identity, national origin, age, disability or veteran status. Applicants must be authorized to work in the United States; we complete Form I-9 for every hire. Visa sponsorship is not available for these positions. Pre-employment drug screening and background checks may be required by project-site rules.

Field crews · hourly