About the role
Erect columns, beams, mezzanine framing, bracing, purlins and girts; bolt up and weld connections at height.
What you'll do
- Rig, hoist and set structural members; install bolts to specification; field-weld where required.
- Install metal deck, stairs, handrails and miscellaneous steel.
- Follow fall-protection and rigging rules 100% of the time.
What you bring
- 3+ years structural steel erection; comfortable working at height.
- OSHA 10 (OSHA 30 preferred); rigging/signal or AWS welding certification a plus.
- Authorized to work in the US; reliable transportation to the job site.
Nice to have
- Bolt-tensioning (TC bolts / turn-of-nut) experience.
- Aerial lift certification.
Pay: competitive, based on experience. Hourly roles: overtime per FLSA; PPE provided.
Openings are tied to project schedules and may be contingent on contract award; we are interviewing now.
CTECP INC is an equal opportunity employer. All qualified applicants receive consideration without regard to race, color, religion, sex, sexual orientation, gender identity, national origin, age, disability or veteran status. Applicants must be authorized to work in the United States; we complete Form I-9 for every hire. Visa sponsorship is not available for these positions. Pre-employment drug screening and background checks may be required by project-site rules.