CTECP
Project team · salaried

Master Electrician — Electrical Superintendent (Master of Record)

Full-timeUnited States · project siteStart: Rolling — interviewing now

About the role

Be the Master Electrician of Record for CTECP INC's TDLR Electrical Contractor license and lead our in-house electrical team on commercial and industrial projects in Texas. A working supervisory position on our own payroll — not a license-rental arrangement.

What you'll do

  • Serve as CTECP INC's Master Electrician of Record; support the TDLR Electrical Contractor license application and keep the company in compliance with Texas Occupations Code Ch. 1305 and TDLR rules.
  • Pull electrical permits with the local authority; schedule, attend and pass inspections.
  • Plan and supervise the work: grounding, underground and under-slab conduit, power distribution, lighting, cable tray, equipment connections, testing and energization support.
  • Build and lead the electrical crew (journeymen and apprentices); verify every TDLR license before anyone starts; keep supervision in line with the rules.
  • Read the stamped drawings, raise RFIs, prepare material take-offs and tool lists; coordinate with the superintendent and the other trades.
  • Enforce NFPA 70E, OSHA electrical safety and lockout/tagout; lead daily job hazard analyses and toolbox talks; deliver as-builts, test reports and closeout documents.

What you bring

  • Active Texas Master Electrician license in good standing, not assigned to another electrical contractor at the time of hire.
  • 8+ years of commercial or industrial electrical work, including 3+ years running crews as foreman or superintendent.
  • Working knowledge of the NEC edition adopted locally, TDLR rules and the permit and inspection process; 480 V distribution, grounding, conduit and cable tray, equipment hook-ups.
  • OSHA 30 (or willing to obtain it); valid driver's license; authorized to work in the US.

Nice to have

  • Bilingual English/Spanish or English/Mandarin.
  • Experience setting up a new electrical division: tools, procedures, apprentices.
  • Experience with classified (hazardous) locations.
Pay: competitive, based on experience. Hourly roles: overtime per FLSA; PPE provided.
Openings are tied to project schedules; we are interviewing now.

CTECP INC is an equal opportunity employer. All qualified applicants receive consideration without regard to race, color, religion, sex, sexual orientation, gender identity, national origin, age, disability or veteran status. Applicants must be authorized to work in the United States; we complete Form I-9 for every hire. Visa sponsorship is not available for these positions. Pre-employment drug screening and background checks may be required by project-site rules.

Project team · salaried