CTECP
Project team · salaried

Master Plumber — Plumbing Superintendent (Responsible Master Plumber)

Full-timeUnited States · project siteStart: Rolling — interviewing now

About the role

Serve as CTECP INC's Responsible Master Plumber (RMP) and lead our in-house plumbing and piping team on commercial and industrial projects in Texas. A working supervisory position on our own payroll — not a license-rental arrangement.

What you'll do

  • Serve as CTECP INC's Responsible Master Plumber with the Texas State Board of Plumbing Examiners (TSBPE) and keep the company in compliance with the Plumbing License Law and Board rules.
  • Pull plumbing permits with the local authority; schedule, attend and pass inspections and tests.
  • Plan and supervise the work: under-slab sanitary and storm piping, domestic water, plastic process piping, site water and underground piping, backflow preventers, valves and meters, pressure and leak testing.
  • Build and lead the plumbing crew; make sure every person doing plumbing work holds a current TSBPE license or registration and is supervised on site as the rules require.
  • Read the stamped drawings, raise RFIs, prepare material take-offs and tool lists; coordinate trenching, sleeves and embeds with the other trades.
  • Enforce OSHA excavation, trench-safety and confined-space rules; lead daily job hazard analyses and toolbox talks; deliver as-builts, test reports and closeout documents.

What you bring

  • Active Texas Master Plumber license in good standing; able to hold the RMP designation for CTECP INC (not serving as RMP for another company at the time of hire).
  • 8+ years of commercial or industrial plumbing and piping work, including 3+ years running crews as foreman or superintendent.
  • Working knowledge of the plumbing code adopted locally, TSBPE rules and the permit and inspection process; underground utilities, plastic process piping (CPVC, HDPE fusion) and backflow assemblies.
  • OSHA 30 (or willing to obtain it); valid driver's license; authorized to work in the US.

Nice to have

  • Bilingual English/Spanish or English/Mandarin.
  • Medical gas or multipurpose fire sprinkler endorsements; backflow tester license.
  • Experience setting up a new plumbing division: tools, procedures, apprentices.
Pay: competitive, based on experience. Hourly roles: overtime per FLSA; PPE provided.
Openings are tied to project schedules; we are interviewing now.

CTECP INC is an equal opportunity employer. All qualified applicants receive consideration without regard to race, color, religion, sex, sexual orientation, gender identity, national origin, age, disability or veteran status. Applicants must be authorized to work in the United States; we complete Form I-9 for every hire. Visa sponsorship is not available for these positions. Pre-employment drug screening and background checks may be required by project-site rules.

Project team · salaried