[email protected] CTECP Mexico · USA · Türkiye · China Mon–Sat 8:00–17:30
CTECP 夜间激光整平机混凝土浇筑——自有施工队伍
Let's Build Your Dream

Global Strength, Local Delivery

Global design-build general contractor. Design-build and EPC across 9 countries — one team, one contract, from feasibility to commissioning.

9Countries
5Continents
10Years Global Growth
$20M+Bonding (USD)
Engineering ConsultingEngineering DesignGeneral ConstructionMEP InstallationCleanroom Design-BuildReal Estate DevelopmentBIM · VDCSteel StructuresIndustrial PlantsProject ManagementDigital Delivery Engineering ConsultingEngineering DesignGeneral ConstructionMEP InstallationCleanroom Design-BuildReal Estate DevelopmentBIM · VDCSteel StructuresIndustrial PlantsProject ManagementDigital Delivery
CTECP 中科工程在 KBY 项目现场的自建办公楼与施工区
250+Projects · 580K m² built
About Us

Integrated Design-Build That Powers Your Project

One contract. One responsibility. From design through commissioning under a single accountable team.

Founded in 2016, CTECP is a design-build general contractor working across 9 countries and 5 continents, with its own legal entities in the markets it serves. We integrate consulting, design, general construction, MEP, cleanrooms and real-estate development under one team — connecting Chinese investment, Mexican execution and US/EU clients.

  • Design-build under one roof: one team, one contract, one responsibility
  • Trilingual (Chinese·Spanish·English) project management across borders
  • Both international standards and local codes on every project
Work With Us
0+
Employees Worldwide
Designers, engineers and specialists
0+
Projects Delivered
Across five continents
0K㎡
m² Built
Total floor area delivered
0%
Repeat Clients
New contracts from existing clients
Scope of Business

Integrated Design-Build Capabilities

One contract. One responsibility. Design through commissioning under a single accountable team.

01

Engineering Consulting

Feasibility studies, site selection and technical due diligence to inform investment decisions.

Learn more →
02

Engineering Design

Civil, structural, MEP and architectural design under one team, with China-to-Mexico standards conversion.

Learn more →
03

General Construction

General contracting for industrial plants, warehouses, commercial and institutional builds.

Learn more →
04

MEP Installation

Mechanical, electrical, plumbing and process utilities — ensuring reliable commissioning.

Learn more →
05

Cleanroom Design-Build

Turnkey cleanrooms for precision manufacturing and electronics, meeting strict cleanliness and process needs.

Learn more →
06

Real Estate Development

Land acquisition, master planning and asset development to help clients establish locally.

Learn more →
The CTECP Model

One Contract, From Blueprint to Handover

In the traditional model, design, construction and supervision sit with different teams — information is lost in handoffs and responsibility is diffused. CTECP's integrated design-build model puts the whole process under one accountable team: faster, more controllable, with zero handoff risk.

  • A single accountable teamDesign, build and delivery under one team.
  • Zero handoff riskNo information lost between phases.
  • Faster & predictableSchedule and cost controlled throughout.
  • Trilingual communicationChinese·Spanish·English, across borders.
CTECP 中科工程工程师在现场核对图纸——设计与施工同一责任团队
One team · One responsibility
Our Service Process

End-to-End Project Delivery

Internal quality control and partial handovers at every stage — never a surprise at completion.

01

Design

Architectural, structural, MEP and process design.

02

BIM Coordination

Interdisciplinary modeling, clash detection, quantity take-off.

03

Preconstruction

Budgeting, scheduling, value engineering, permitting.

04

Construction

Civil works, MEP install, equipment integration.

05

Process Control

Quality assurance, commissioning, handover.

Digital delivery

See the project without being on it.

We built our own project platform. The tools we use to run the work are the same ones the owner logs into.

BIM / VDC

BIM & VDC

Full-discipline 3D coordination, clash detection and model-based quantity take-off — before anyone breaks ground.

PORTAL

Owner project portal

Live schedule, drawings, weekly reports and a dated photo log. Your own login, updated from site.

AIS / LOGISTICS

Shipment tracking

Containers and vessels tracked from factory to site, with live AIS positions and arrival forecasts.

360° RECORD

360° site record

8K panoramic documentation at every milestone — walk any stage of the build after it is closed up.

See a live 360° site
CTECP 自有队伍夜间混凝土浇筑作业
On site

We self-perform the work that decides the schedule.

Standards & Compliance

Built to the standards your industry demands

On every project we design and build to international standards and Mexican codes — and document it. From ISO-classified cleanrooms to automotive-grade plants.

Quality & Management

ISO 9001ISO 14001ISO 45001

Processes aligned to international quality, environmental and occupational health & safety management standards.

Industry Standards

IATF 16949ISO 14644GMP-ready

Automotive-grade plants, ISO-classified cleanrooms and controlled environments for electronics, medical and food.

International Engineering Codes (US-based)

ANSIASTMASMEAWSAISCACIASHRAENFPAOSHAUL

We design and build to the US engineering and safety code system — the standards used worldwide.

Local Codes & Permitting

🇺🇸 United States
IBCNECIMCIFCADA / TASAHJ Permits
🇲🇽 Mexico
NOMSTPSIMSSSEMARNATCFE
🇹🇷 Türkiye
TBDY 2018TS 500 / 498Yangın Yön.İSG 6331Yapı Ruhsatı

Permitting and code compliance in the US, Mexico and Türkiye — handled in-house, end to end.

🌐 UN Global Compact member 🛡 USD 20M+ bonding capacity 💬 Trilingual delivery · EN · ES · 中文
KBY 圣路易斯波托西厂区航拍——中科工程交付
KBY · San Luis Potosí

This is not a render.

Delivered work

What we deliver can be visited.

Every image is from our own projects. No renders, no stock photography.

Edificio de oficinas con fachada de aletas metálicas montada, campus KBY en San Luis Potosí
Office building — façade installedView the project →KBY · San Luis Potosí · 2026
Pasillo de servicio de una sala limpia terminada, con mamparas y ventanas de inspección
ISO 8 cleanroom — service corridorView the service →ISO 14644-1 · Handover
Montaje de estructura metálica junto a una nave en operación con paneles solares
Steel erection beside an operating plantView the project →KBY · Fase 4 · 2026
Entrepiso técnico con ductos aislados, bandejas y tubería de proceso sobre una sala limpia
Technical plenum — MEP above the cleanroomView the service →Ducts · Trays · Process
Colado nocturno de piso industrial con cuadrilla propia de CTECP
Night pour — industrial floor slabView the project →KBY · Own crew · 2025

Is your plant at one of these stages? We will tell you in writing whether your date holds — before you sign anything.

Free schedule assessment
Project in focus

KBY · San Luis Potosí

91,000 m² — from bare ground to production.

KBY 办公楼施工阶段——中科工程交付
01Office building
KBY 独立基础施工航拍
02Foundations
KBY 钢结构安装航拍
03Steel erection
KBY 屋面钢结构封顶俯拍
04Structure complete
KBY 建成厂房与屋面光伏
05In production
KBY 场地工程与围墙施工
06Site works
Project Portfolio

Engineering Strength Proven by Delivery

Landmark industrial projects across North & South America, Europe, Africa and the Middle East.

Changying Mexico plant electrical, mechanical and HVAC installation
MEP Installation

Changying · México

México · 2024

Full electrical, mechanical and HVAC installation — power distribution, cable trays, process piping (compressed air / vacuum / nitrogen) and anti-corrosion systems.

KBY Mexico manufacturing campus aerial with rooftop solar in San Luis Potosí
Manufacturing Campus

KBY Mexico

San Luis Potosí · 91,000㎡

New-build manufacturing campus — broke ground Sept 2024.

BMW Training Center Mexico
Training & Exhibition

BMW Training Center

San Luis Potosí · 19,600㎡

Premium training and exhibition facility for BMW Mexico.

LEONI Türkiye facility
Automotive Wiring

LEONI Türkiye

Bursa, Türkiye · 10,500㎡

Automotive wiring-systems manufacturing facility.

Automotive plant expansion, San Luis Potosi
MEP Installation

Automotive Plant Expansion

Villa de Reyes, SLP · 33,426㎡

3,000A copper busway main distribution and substation, compressed air, siphonic rainwater and fire protection — MEP installation and commissioning.

Industrial manufacturing base
Industrial

Large Industrial Base

San Luis Potosí · 51,000㎡

Integrated structure, finishes and utilities delivery.

View all case studies →
Clients Who Trust Us

Trusted by Global Industry Leaders

Leaders in automotive, electronics and industrial sectors across three continents.

BMWMAGNAWhirlpoolLeoniLuxshareFaureciaJohnson ControlsInovanceNucor·JFEWhirlpoolKBY BMWMAGNAWhirlpoolLeoniLuxshareFaureciaJohnson ControlsInovanceNucor·JFEWhirlpoolKBY
Automotive & Mobility
BMWMAGNAFaureciaJohnson ControlsTuopuRonal GroupDaye
Electronics & Precision
Luxshare ICTInovanceEverwinLeoniStar Tech
Industrial & Other
WhirlpoolNucor-JFE SteelKBYOxxoEternalXusheng

70% of new contracts come from repeat clients

Global Footprint

Following Our Clients into Every Market

Established legal entities and local teams in 9 countries across 5 continents.

2016Mexico
2023China
2024USA
2024Morocco
2024Hong Kong
2024Brazil
2025Bulgaria
2025Israel
2025Hungary
2026Czech Republic
MonterreyMonterrey · HQ (Mexico)
+52 1 81 1004 4128 [email protected]
Covering Monterrey, SLP, Querétaro, Mexico City, Puebla industrial corridors
PueblaPuebla · Branch (Mexico)
[email protected]
Fluent in NOM, IMSS, STPS, SEMARNAT local norms
Mon–Sat 8:00–17:30, Sunday closed
KatyKaty · CTECP INC (USA)
+1 904 788 3028 [email protected]
611 Choctaw Ln, Suite E, Katy, TX 77494
Covering the Houston metro and Texas Gulf Coast industrial corridor

Group entities: CTECP Mexico · CTECP USA · CTECP Türkiye · Zhongke Engineering Hong Kong · Zhongke Trading China

HSE & Sustainability

Safety first. Built responsibly.

We protect our people, our clients' assets and the communities we build in — and we build for the long term.

Safety-first culture

Risk assessments, work permits and toolbox talks toward a zero-incident goal — to STPS, NOM-031 and OSHA practice.

Quality you can audit

ISO 9001-aligned QA/QC, inspection & test plans (ITP) and full documentation — quality that withstands audits.

Environmental responsibility

SEMARNAT compliance, waste and water management, and energy-efficient design that cuts long-term consumption.

People & community

Local hiring and training, building responsibly under our UN Global Compact commitments.

Why CTECP

One Partner. Three Markets. Zero Handoff Risk.

Connecting Chinese investment, on-the-ground execution and Western clients — nothing lost in translation.

Cross-Border Execution

Trilingual (Chinese·Spanish·English) project management.

Design-Build Under One Roof

From feasibility to commissioning — one team, one contract.

Local Depth, Global Standards

Both OSHA/ANSI/NFPA/ISO and NOM/IMSS/STPS on every project.

Financial Strength

USD 20M+ bonding capacity — scale with us without risk.

Standards we work to
ISOOSHAANSIASTMNFPAACIAISCAWSNOMIMSSSTPSSEMARNATUN Global Compact Member
Leadership

The people accountable for your project

KQ
We built CTECP on one promise — one team, one contract, one responsibility, from the first drawing to the day your plant runs. That's why 70% of our work comes from clients who came back. Whatever you're building in Mexico, we'll build it with you.
Keelwey Qin · 覃成威Founder & CEO
FAQ

What You Might Want to Know

Common questions about our business, global footprint and how we work.

What does CTECP do?
We are a global design-build general contractor, integrating engineering consulting, design, general construction, MEP installation, cleanrooms and real estate development under one accountable team — one contract from blueprint to handover.
Where does CTECP operate?
Founded in Mexico in 2016, we operate across 9 countries on 5 continents (Mexico, USA, China, Morocco, Hong Kong, Brazil, Bulgaria, Israel, Hungary, Czech Republic). Our HQ is in Monterrey, with a branch in Puebla.
What is design-build and why choose it?
Design-build means one team and one contract handle the whole project from design through commissioning — no handoff between separate firms, so information isn't lost, responsibility is clear, and delivery is faster and more predictable, with zero handoff risk.
Which industries and clients do you serve?
We serve automotive, electronics, industrial, energy, logistics and data-center clients. We've delivered 250+ projects (580K m²+ built) for companies such as BMW, Magna, Whirlpool and Luxshare, with 70% of new contracts from repeat clients.
What languages do you work in?
Our project management is trilingual — English, Spanish and Mandarin Chinese — connecting Chinese investment, Mexican execution and US/EU clients with nothing lost in translation.
How do I start a project or get a quote?
Email [email protected] or call +52 1 81 1004 4128, or fill in the quote form at ctecp.com. We'll discuss your project type, location and needs and propose the best approach.
Insights

Insights & Build Guides

Practical reads on building in Mexico, design-build and nearshoring.

Gıda & İçecek · Türkiye

Türkiye'de Gıda ve İçecek Tesisi İnşaatı

Bira ve şişelemeden süt ürünleri ve paketli gıdaya kadar, Türkiye'de bir gıda veya içecek …

Read →
Soğuk Zincir · Türkiye

Türkiye'de Soğuk Hava Deposu İnşaatı

Gıda, ilaç ve lojistik için soğuk hava depoları özel yalıtım, güvenilir soğutma ve dayanık…

Read →
Otomotiv · Türkiye

Türkiye'de Otomotiv ve Yan Sanayi Fabrika İnşaatı

Türkiye, Avrupa'nın önde gelen otomotiv üretim üslerinden biridir. Bu tesisler büyük açıkl…

Read →
EPC · Türkiye

Türkiye'de Fabrika İnşaatı: Anahtar Teslim EPC

Türkiye'de fabrika kurmak; mühendislik, tedarik ve inşaatın kusursuz koordinasyonunu ister…

Read →
EPC Guide · Turkey

Building a Factory in Turkey: A Design-Build / EPC Guide

Turkey's position between Europe, the Middle East and Central Asia makes it a strategic ma…

Read →
Temiz Oda · Türkiye

Türkiye'de Temiz Oda İnşaatı

İlaç, medikal cihaz, elektronik ve gıda tesisleri sınıflandırılmış temiz odalar, kontrollü…

Read →
İlaç · GMP

Türkiye'de GMP ve İlaç Temiz Oda İnşaatı

İlaç ve yaşam bilimleri tesisleri sınıflandırılmış temiz odalar, valide edilmiş sistemler …

Read →
Elektronik & Medikal

Türkiye'de Elektronik ve Medikal Cihaz Temiz Odaları

Elektronik ve medikal cihaz üretimi ESD korumalı, sınıflandırılmış ve hassas kontrollü tem…

Read →
Cleanroom · Turkey

Cleanroom Construction in Turkey

Pharmaceutical, medical device, electronics and food facilities in Turkey need classified …

Read →
Food & Beverage

Food & Beverage Plant Construction in Mexico

From breweries and bottling to dairy and packaged foods, building a food or beverage plant…

Read →
Alimentos y Bebidas

Construcción de Plantas de Alimentos y Bebidas en México

De cervecerías y embotellado a lácteos y alimentos empacados, construir una planta de alim…

Read →
Pharma & GMP

Pharmaceutical & GMP Cleanroom Construction in Mexico

Pharmaceutical and life-science facilities demand classified cleanrooms, validated systems…

Read →
Medical Device

Medical Device Manufacturing in Mexico: Plants & Cleanrooms

Mexico is a fast-growing hub for medical device manufacturing nearshoring. These plants ne…

Read →
Logistics

Distribution Center & Warehouse Construction in Mexico

Nearshoring is driving demand for distribution centers and logistics warehouses across Mex…

Read →
Alimentos · Brasil

Construção de Plantas de Alimentos e Bebidas

De cervejarias e envase a laticínios e alimentos embalados, uma planta de alimentos exige …

Read →
Nearshoring · US

A US Manufacturer's Guide to Building a Plant in Mexico

More US manufacturers are nearshoring production to Mexico. Building a plant there is very…

Read →
Delivery Model · US

Nearshoring to Mexico: Why Design-Build / EPC Wins

When you build abroad, the model you choose matters as much as the builder. For nearshorin…

Read →
Critical Path · US

CFE Power & Permitting: The Hidden Critical Path in Mexico

Two near-identical plants break ground the same week. Eighteen months later one is running…

Read →
Nearshoring · Brasil

Construção Industrial no México e nas Américas

Cada vez mais fabricantes expandem para o México e para as Américas. Construir uma planta …

Read →
Modelo · Brasil

Design-Build / EPC: a Vantagem para Fabricantes

Ao construir no exterior, o modelo importa tanto quanto o construtor. O design-build / EPC…

Read →
Nearshoring · LatAm

Nearshoring en LatAm: Cómo Construir su Planta en México

México es la puerta del nearshoring hacia Norteamérica, y cada vez más empresas de LatAm c…

Read →
Build Guide

Building a Plant in Mexico

Site selection, permits (NOM/IMSS), design and construction — end to end.

Read article →
Delivery Model

Design-Build vs. Traditional

Why single-contract design-build is faster, controllable and lower-risk.

Read article →
Nearshoring

Nearshoring Checklist

A construction checklist before you break ground in Mexico.

Read article →
中文指南 · 中文

墨西哥建厂全流程指南

面向中资企业的墨西哥建厂中文实战指南:选址、报建、设计与施工全流程。

Read article →
View all insights →
Let's Work Together

Ready to start your next project? Let's Build Your Dream together

Contact Us

Get in Touch with CTECP

Wherever your project is — in Mexico or beyond — we're ready to support you.

Suppliers & Procurement[email protected]
Group EntitiesCTECP Mexico · CTECP USAZhongke Trading China

Get a Quote

Fill out the form and we'll get back to you soon.

By submitting, you agree to be contacted by CTECP about this inquiry.

🇲🇽WhatsApp · Mexico

Scan to add on WeChat

WeChat QR
WeChat IDCTECP88888888

Paste the ID in WeChat search to add us · or scan the QR code